Free planning tool

Commercial EV Charger Cost Calculator

Build an indicative UK project budget using charger type, quantity, cable route, groundworks and electrical requirements. The result is a planning range — not a quotation.

1

Your site

Tell us what type of commercial location you are planning for.

Use charging sockets/connectors rather than vehicles. Grant limits are socket-based.
2

Charging hardware

Select the main charger power for this estimate.

Need help choosing charger power? Compare commercial EV chargers →

3

Installation complexity

These factors can materially change the project cost.

Smart load management can help distribute available power across multiple chargers.
4

Potential grant support

Only apply a grant if you have checked that the organisation and installation are eligible.

Both schemes currently cover up to 75% of eligible purchase/installation cost including VAT, subject to per-socket and 40-socket caps. Eligibility is not checked here. Check full WCS eligibility rules →
No contact details required.

Methodology

What the calculator includes

The model uses broad 2026 UK market ranges and separates the parts of a project that scale with charging sockets from shared site-level costs. It is intended to give a defensible early budget, not false precision.

  • Base installed socket: charger hardware, standard protection/commissioning and a straightforward local installation. AC assumptions are anchored around published 2026 installed commercial ranges; DC ranges are intentionally wider.
  • Scale: multi-socket AC projects receive a modest unit-cost adjustment because distribution, labour and commissioning can be shared. The model does not assume unrealistic linear savings.
  • Civils: cable distance scales per socket, while trenching/reinstatement combines shared and per-bay allowances.
  • Electrical capacity: unconfirmed or upgraded supply is a project-level planning allowance. An actual DNO/connection offer can sit outside the range.
  • VAT: all headline planning assumptions are ex VAT; the result separately shows 20% VAT and the gross total.
  • Grants: WCS calculations use up to 75% of estimated gross eligible cost, capped at £500 per socket; the state-funded education version uses £2,000 per socket. Both are capped at 40 sockets and currently run to 31 March 2027.
Sources checked 1 September 2026

Grant rules: OZEV / GOV.UK 2026 grant changes and Workplace Charging Scheme guidance. Network context: GOV.UK connection guidance. Market ranges were cross-checked against current UK commercial installation guides, including MyBuilder’s 2026 commercial installation cost guide and Evova’s July 2026 commercial cost guide.

Important: Grant eligibility, values and deadlines can change. A charger/site may also have costs that are not eligible for grant support. Check the current GOV.UK guidance and obtain a site-specific quotation before committing budget.